- Home Page /
- Tools & Home Improvement /
- Plumbing /
- Water Heaters & Parts /
- Water Heater Parts /
- Aquapro 69716 9.5 Long Lead Free Packaged Mag...
Aquapro 69716 9.5 Long Lead Free Packaged Magnesium Anode Rod with 34 Male Pipe Thread
KYD 21
Price Details
Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )
*All items will import from US
QTY:
Ubuy works hard to protect your security and privacy. Our advanced payment security system ensures confidentiality by encrypting your information during transmission using AES (Advanced Encryption Standards) and SSL (Secure Socket Layer) protocols. Your payment details are 100% secure as we do not share your payment details with third party sellers.
Significantly Extends The Water Heater Tank Life.
Fast
Shipping
Free
Return*
Secure Packaging
100% Original Products
PCI DSS Compliance
ISO 27001 Certified
What Stands Out
Product Details
| Item Weight | 1 lbs (450 grams) |
Who Should Buy?
-
Homeowners
Ideal for homeowners seeking to prolong the life of their water heaters by preventing corrosion effectively.
-
DIY Enthusiasts
Great for DIYers who want to replace anode rods themselves to improve water heater performance.
-
Eco-Conscious Users
Suitable for environmentally aware consumers looking for lead-free, eco-friendly components in their plumbing systems.
-
Professional Plumbers
May not be suited for plumbers seeking specialized or custom solutions beyond standard replacement options.
-
Large Households
Not ideal for large homes requiring backup systems or heavier-duty anode rods for enhanced corrosion prevention.
-
High-Volume Systems
Unsuitable for industrial applications or high-demand systems needing a more robust solution for sustained water quality.
Product Description
Aquapro 69716 9.5 Long Lead Free Packaged Magnesium Anode Rod with 34 Male Pipe Thread
Customer Questions & Answers
-
Question:
What types of water heaters is this anode compatible with?
Answer: It is specifically designed for Suburban and Morflo water heaters. -
Question:
How does the magnesium anode rod work?
Answer: It attracts the elements that cause corrosion, protecting the tank. -
Question:
How often should I replace the anode rod?
Answer: It is recommended to check the anode rod every 1-2 years and replace it as needed.
Aquapro Water Heater Parts Editorial Review
Customer Reviews & Ratings
-
5 Star
0%
-
4 Star
100%
-
3 Star
0%
-
2 Star
0%
-
1 Star
0%
Review this product
Share your thoughts with other customers
Platform Trust & Buyer Confidence
“The product received very good packaging & safe…Thank You”
“Accurate delivery timing given”
“Not madly expensive like I thought, and much quicker than promised.”
“Never dealt with Ubuy before, but everything worked out great. Seamless cross border purchasing and shipping. Thanks!”
“The process was smooth, with clear communication and timelines. This was my 1st purchase and I am really impressed. I will definitely be coming back.”
Product Price History
Important information
- Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
- Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.
KYD 21
Order now and get it around Monday, July 20
This item is not restrict in my country.(Please click on above link if this item is not restrict in your country, So our team will review and allow.)
QTY:
PCI DSS compliant and ISO 27001:2022 certified, with encrypted payments and full buyer protection on every order.
Features & Benefits
- 18% more magnesium for enhanced corrosion protection.
- Prolongs the life of your water heater.
- Magnesium anode rods attract damaging elements.
- Designed specifically for Suburban and Morflo water heaters.
- Easy out-of-box installation.
- Essential for maintaining water heater efficiency.
Ubuy Assurance
Experience worry-free shopping with 100% original products, PCI DSS-compliant payment security, ISO 27001-certified data protection, the fastest cross-border delivery, free returns *, and secure packaging on every order.